THE IRISH WATER SHANNON PROJECT IS NOT NEEDED

Irish Water wants to spend EUR1.3billion (EUR1,000 for every family in Ireland) to pump water 172km from the Shannon to Dublin.

After THREE ERRORS in Irish Water's analysis are corrected, its own methodology shows there is no need for a project of the scale and expense of the Shannon pipeline. This assumes nothing more than Irish Water's own EXISTING leakage targets.

 

 Kennedy Analysis has previously published THREE REPORTS on the Shannon Project (contact us for copies of these reports). The recent  KENNEDY ANALYSIS OVERVIEW is an overview of the three Kennedy Analysis reports. 

 

Follow

©2017 by Kennedy Analysis